International foundry relocation project

FISS Exports Bühler Carat 140, Bühler Evolution and Additional Foundry Equipment from Israel to Slovenia

FISS coordinated the purchase, dismantling, documentation, packaging and international transport of several die casting cells and foundry systems from Israel to Slovenia. The complete project involved approximately 550 tonnes of equipment and was completed under significant time pressure by an 18-person team.

Project scope Several complete casting cells
Total weight Approx. 550 tonnes
Project team 18 people
Transport route Israel to Slovenia
Project at a glance

Which foundry systems were transported from Israel to Slovenia?

The project included several Bühler Carat and Bühler Evolution die casting cells with extensive automation equipment.

In addition, a StrikoWestofen aluminium melting furnace, several Rösler linear-flow continuous systems, an Yxlon X-ray inspection system and additional foundry equipment were dismantled, packaged and transported to Slovenia.

Consulting and network

From machine sourcing to international site relocation

A company in Slovenia was searching for suitable casting cells for the production of aluminium housings for the automotive industry.

Through the international FISS network, a suitable equipment package was located in Israel and the extensive purchase was organised within a short period.

01 · Search

Finding suitable casting cells

FISS searched the international used machinery market for suitable systems for the planned automotive production.

02 · Consulting

Technical assessment

The available machines were assessed with regard to system scope, production task and technical suitability.

03 · Implementation

Complete project management

Following the purchase, FISS coordinated dismantling, documentation, packaging, loading and transport.

Equipment scope

Which machines and systems were included in the project?

In addition to the die casting machines, the project included automation, melting technology, finishing equipment, quality inspection systems and additional equipment for a complete foundry production process.

Die casting cells

Bühler Carat and Evolution

Several complete die casting cells formed the most important part of the equipment package.

  • Bühler Carat 140 die casting cells
  • Bühler Evolution die casting machines
  • Extensive automation equipment
  • Designed for automotive components
Melting technology

StrikoWestofen aluminium melting furnace

The melting furnace was part of the upstream aluminium supply system for the die casting production process.

  • Aluminium melting technology
  • High dismantling and packaging requirements
  • Allocation of lines and connections
  • Preparation for reassembly
Finishing and inspection

Rösler and Yxlon systems

Surface treatment and quality inspection systems completed the production chain.

  • Rösler linear-flow continuous systems
  • Yxlon X-ray inspection system
  • Additional foundry equipment
  • Separate protective packaging
Project process

From equipment purchase in Israel to the production site in Slovenia

Due to the short preparation period, all project phases had to be scheduled closely and partly carried out in parallel.

01

Machine sourcing

FISS identified a suitable equipment package in Israel through its international network.

02

Project planning

Dismantling sequence, team planning, packaging, loading and transport were coordinated at short notice.

03

Dismantling

An 18-person team worked in several shifts, including Saturdays and Sundays.

04

Documentation

Every component was labelled, photographed and documented for subsequent reassembly.

05

Transport

Approximately 550 tonnes were transported by sea and then by road to Slovenia.

Working under time pressure

How was the extensive project completed at short notice?

Only a limited amount of preparation time was available. The work was therefore organised in several shifts.

The team consisted of customer employees and the FISS dismantling team. A total of 18 people were involved, including weekend work.

  • Short preparation period
  • Work in several shifts
  • Operations on Saturdays and Sundays
  • 18 people in the joint project team
  • Parallel dismantling of several systems
  • Close coordination with the customer
  • Continuous project communication
  • Rapid response to changes
Documentation

Why were all components labelled and photographed?

With several complete casting cells, comprehensive documentation is essential so that all components can be allocated clearly and reassembled correctly at the destination.

Labelling

Clear allocation of components

Machine assemblies, lines, cables, fasteners and accessories were labelled systematically.

Photographic documentation

Visual recording of connections

Photographs documented installation situations, interfaces and the condition of components before transport.

Completeness

Checking the equipment scope

Structured recording supported the verification that all components had been loaded completely.

Reassembly

Support at the new location

The documentation provided the customer with an important basis for reassembly and commissioning in Slovenia.

Transport scope

How were approximately 550 tonnes of foundry equipment transported?

Different loading units were used for the heavy and large equipment components.

18 40-foot open-top containers

For machine components that had to be loaded from above.

13 40-foot MAFI loading units

For particularly heavy or oversized machine assemblies.

1 Special wooden crate

For the protected transport of the sensitive Yxlon X-ray inspection system.

Transport route

International plant relocation from Israel to Slovenia

Following dismantling, packaging and loading, the systems were transported by sea and then moved to the new production site in Slovenia.

Starting location Israel
Destination Slovenia
Unexpected challenges

How did the project team respond to the changed transport route?

Despite careful preparation, short-notice changes may occur during international transport projects.

The shipping company changed the planned route and postponed the loading date. As a result, the sea voyage was unexpectedly extended to approximately three weeks.

Route change

Short-notice adjustment

The planned sea freight route had to be changed by the shipping company at short notice.

Schedule change

Revised loading plan

The postponement required renewed coordination of the loading units that had already been prepared.

Project communication

Customer kept informed

The customer was kept informed about the current status and all changes throughout the entire project.

Reassembly in Slovenia

How long did it take to reassemble each die casting cell?

The customer carried out the reassembly and commissioning of the delivered machines independently. FISS remained available for support when required.

Reassembly

Approximately two months per casting cell

Approximately two months were required per die casting cell for reassembly, connection and preparation for commissioning.

Support

FISS as technical contact

Although the customer carried out the reassembly independently, the FISS team remained available for questions and technical support.

The FISS advantage

One contact for complete foundry relocation projects

International plant projects require technical expertise, a reliable network and dependable coordination of all parties involved.

FISS supports customers from machine sourcing and purchasing through dismantling, packaging and international relocation.

  • Over 40 years of experience in foundry technology
  • International network for used machinery
  • Technical consulting for equipment purchases
  • Planning of complex dismantling projects
  • Coordination of several project teams
  • Photographic and technical documentation
  • Professional packaging and loading
  • Organisation of sea and road transport
  • Support with reassembly
  • One central contact for the complete project
Frequently asked questions

Questions about the plant relocation from Israel to Slovenia

Which die casting machines were transported?
Several Bühler Carat and Bühler Evolution die casting cells were transported, including extensive automation equipment.
Which additional foundry systems were included?
The equipment package included a StrikoWestofen aluminium melting furnace, Rösler linear-flow continuous systems, an Yxlon X-ray inspection system and additional foundry equipment.
What was the total transport weight?
The complete transport weight was approximately 550 tonnes.
How large was the dismantling team?
A total of 18 people were involved. The team consisted of customer employees and the FISS dismantling team.
Which loading units were used?
The transport involved 18 40-foot open-top containers, 13 40-foot MAFI loading units and one wooden crate for the Yxlon X-ray inspection system.
Why were all components photographed?
The photographic documentation supported the clear allocation of components and helped with subsequent reassembly in Slovenia.
How long did it take to reassemble one casting cell?
Reassembly and preparation for commissioning took approximately two months per die casting cell.
Does FISS support complete foundry relocation projects?
Depending on the project, FISS can coordinate machine sourcing, purchasing, dismantling, documentation, packaging, loading, transport and support with reassembly.
Request plant relocation

Are you planning the purchase and international transport of complete foundry equipment?

Send FISS information about the required machines, the current location, destination, desired equipment scope and planned schedule. Our team will assess the requirements and discuss the appropriate procedure with you.

Telephone: +49 (0)7181 60696-0   ·   Email: info@fiss-machines.com